Tuesday, December 22, 2009

Wednesday 23rd December



Sorry, It has been a while.


The gyprockers have been busy for weeks with not much else able to be done around them.


The carpenters will be on site till Christmas eve.


The Gyprockers will be on site till Christmas eve.
The electrician has finished for this year.
And the plumber says he hasn't got anything to do at the moment.
So along Jack's Corner Road.
You can expect.
The gyprockers' vans and
the carpenters utes and trucks.
Plus there may be another delivery of timber before Christmas.
Hope this helps
Regards
Chris

Wednesday, December 2, 2009

Thursday 3rd December



And then they started the firplaces.


Thursday should see the normal activity on site.


The electrician will be there.

The carpenters will be there.
The plumbers are due on site
and the firplace guys will be back for the next few days.
so along Jacks' Corner Road you can expect;
All the normal utes and trucks
Hope this helps
Regards
Chris

Monday, November 30, 2009

Tuesday 1st December



My How time flies when you are building.

It is funny how lining the walls makes you feel as if you are getting somewhere.

Tuesday could be busy.
The plumbers should be on site.
The roofers are expected.
The electricians will be there
The fireplace guys are coming to install
and of course the carpenters will be there.
I don't think there are any deliveries due .
So, along Jacks' Corner Road you can expect;
All the usual Utes and trucks that go with all the tradespeople we are all getting used to.
Hope this helps
Regards
Chris

Thursday, November 26, 2009

Friday 27th November



The garage is looking good.


Friday we will have on site;
Plumbers
electricians
carpenters
Gyprockers and
there could be a delivery of roof capping
So along Jacks' Corner road you can expect
All the usual Utes and trucks and maybe a
larger truck doing the delivery.
Hope this helps
Regards
Chris

Wednesday, November 25, 2009

Thursday 26th November

Well they nearly got the roof finished.

Just the barge and capping to go.

Thursday we will have
Electricians
Plasterers
Carpenters
and Plumbers on site.

So, along Jacks' Corner Road you can expect
many Utes and trucks and maybe a delivery of the capping and barges
Hope this helps
Regards
Chris
christreuen@bigpond.com

Tuesday, November 24, 2009

Wednesday 25th November



Well, they nearly finished the roof today.
A big day with many things happening.
Wednesday, we have the cladding carpenters on site .
The electrician will be on site.
The plumbers are due back.
And they are coming to adjust the scaffolding.
So, along Jacks' Corner road you can expect.
Trucks and Utes belonging to the tradespeople and
Most probably a delivery truck with more cladding and lumber.
Hope this helps
Regards
Chris

Monday, November 23, 2009

Tuesday 24th November



Friday they managed to get some of the roof on before it became too windy.
Today could be a very busy day if the weather permits.
The cladding carpenters will be on site.
The roofers will be on site.
The gyprockers will be on site.
The guys installing the insulation will be on site.
The electrician will be on site .
and the Plumber is due on site.
I think there will be deliveries of roofing material and also insulation and gyprock.
So, along Jacks' Corner Road you can expect.
A lot of Utes and trucks belonging to the tradespeople
and larger trucks doing deliveries.
Hope this helps
Regards
Chris

Thursday, November 19, 2009

Friday 20th November



We found the truck. 2nd Time lucky.


So all the roofing material is on site.


Friday the roofer will be on site.


The plumbers will be on site.
The cladding carpenters will be on site and
The electrician will be on site.
And the crane is coming first thing in the morning to load the sheeting onto the roof.
A busy day.
So , along Jacks' Corner Road you can expect.
A large crane and
many Utes and trucks all arriving early in the morning.
Hope this helps
Regards
Chris

Wednesday, November 18, 2009

Thursday 19th November

Has anyone seen a large truck with roofing iron on it. We seem to have lost it yesterday.

If it didn't get to site yesterday expect it along the road today.

There will also be a large crane to lift the iron onto the roof.

The cladding carpenters will be on site.

The plumbers will be on site and

The electrician will be on site.

So , along Jack's Corner Road you can expect:

All the usual Utes and trucks and
The large truck with roofing iron and
The crane.
Hope this helps
Regards
Chris
Christreuen@bigpond.com

Thursday, November 12, 2009

Friday 13th November



I think Friday is going to be busy.


The cladding carpenters are going to be on site.
The framing carpenters are due back and
I think the roof plumbers are coming back again.
It looks like it is finally taking shape.
So, along Jacks' Corner road you can expect:
All the usual utes and trucks.
Hope this helps
Regards
Chris
Christreuen@bigpond.com

Tuesday, November 10, 2009

Wednesday 11th November



A rather large front door.


Tuesday went well so Wednesday should be quieter.
The cladding carpenters will be on site.
The plumbers will be on site.
The roof plumber is coming to measure the main roof.
And I have a few appointments on site.
So along Jacks' Corner Road you can expect;
Just all the normal Utes and trucks associated with the tradespeople.
Hope this helps
Regards
Chris

Monday, November 9, 2009

Tuesday 10th November



It is in the frustrating stage where nothing seems to get finished.
Tuesday it should be the cladding carpenters and the roofing carpenters.
And maybe a plumber or two.
So, along Jacks' Corner road:
The usual utes and trucks.
Hope this helps
Regards
Chris

Thursday, November 5, 2009

Friday 6th November

Same old, Same old.

Weather permitting.
The carpenters will be on site and
The scaffolding guys are coming to raise the decks on the house scaffolding.

Thats about all I know.

So if the sun shines, along Jacks' Corner Road you can expect:

Various utes and trucks and the scaffolding truck.
Hope this helps
Regards
Chris
christreuen@bigpond.com

Wednesday, November 4, 2009

Thursday 5th November



More Cladding, But there is good news as they have started on the outriggers for the house roof.
Thursday could be busy.
The cladding carpenters are back.
The roof carpenters will be on site and
I think the electrician will be on site.
Also, the Gyprockers are coming to quote tomorrow.
So, along Jacks' Corner Road you can expect:
All the usual Utes and trucks that go with having tradespeople on site.
Hope this helps
Regards
Chris

Monday, November 2, 2009

Tuesday 3rd November



They just keep cladding on.


Tuesday should be a busy day on site.


I am expecting the electrician and the plumbers and
an army of Carpenters.
The electrician will finish wiring the garage.
The plumbers are supposed to get the trench sorted out near the water tanks
And the carpenters are supposed to be doing some more cladding and organising the outriggers on the house roof.
So, It could be busy along Jacks' Corner Road.
All the tradesman's Utes and trucks and
Possibly a delivery of roofing timber.
Hope this helps
Regards
Chris

Thursday, October 29, 2009

Friday 30th October



And then you just put the roof on.


I don't expect the roofers back for a while but the carpenters will be there again Friday.
And i don't know of any deliveries due.
So, a quiet day along Jacks' Corner Road.
Just the Carpenter's Utes and truck.
Hope this helps
Regards
Chris

Wednesday, October 28, 2009

Thursday 29th October



Still putting cladding up.


Thursday we have the carpenters and the roofers turning up.
And I think there is more roofing material to arrive.
So along Jacks' Corner Road you can expect.
The normal tradesman's utes and trucks and
Maybe another large delivery truck
Hope this helps
Regards
Chris
Christreuen@bigpond.com.au

Tuesday, October 27, 2009

Wednesday 28th October



You think you are getting somewhere when you go round a corner.


The carpenters think they are going to be there for the next six weeks. At least they are staying in the valley.

Wednesday is another day with just the carpenters on site. But the delivery that didn't turn up Tuesday should turn up on Wednesday.

So, along Jack's Corner Road you can expect:

The carpenters Utes and trucks and
a truck delivering the roofing material.
Hope this helps
Regards
Chris
christreuen@bigpond.com

Monday, October 26, 2009

Tuesday 27th October

Surprisingly, the carpenters worked Monday through the rain.

Another not so busy day expected Tuesday.

The carpenters are back on site and there should be more deliveries of Roofing material.

I think the roofers themselves are not due until Wednesday.

So, along Jacks' Corner Road you can expect:

The carpenters utes and
The delivery truck with the roofing material.
Hope this helps
Regards
Chris
Christreuen@bigpond.com

Sunday, October 25, 2009

Monday 26th October

It is starting to look like a house. Be better with a roof though.

Weather Permitting, I am expecting the carpenters to be on site

and the first delivery of the roofing material.


So, not a great deal happening but is should get busier later in the week.
Along Jacks' Corner road you can expect.
The carpenter's ute and truck and
The delivery truck for the roofing material.
Hope this helps
Regards
Chris

Thursday, October 22, 2009

Friday 23rd October

Well, you can't have photos everyday besides I lent the camera to someone.

Friday it is plumbers and carpenters and that is about it.

So, along Jacks' Corner Road you can expect;

The carpenter's two utes and
The plumber's truck.

An easy day all round.
Hope this helps
Regards
Chris
christreuen@bigpond.com

Wednesday, October 21, 2009

Thursday 22nd October



The pool slab went well. Council are happy. What else could you ask for.


The roofers returned Wednesday to do some more setup but wont be back till next week to do the sheeting.


The carpenters are on site every day and spend their lunch hour ridding the lake of Carp.
We have to do some more welding on the garage doors and that is happening on Thursday.
So Thursday is carpenters and the guys to do the welding.
So along Jacks' Corner Road you can expect:
Various utes and trucks and no major deliveries.
Hope this helps
Regards
Chris
Christreuen@bigpond.com

Tuesday, October 20, 2009

Wednesday 21st October



Sorry, I have been off the air.

The computer died and Lazyfish had to come to the rescue.
Anyway, they have been busy cladding the shed. The carpenters are abusing me because there are too many windows and doors which means far too many things for them to have to cut the boards around.
But they are doing a great job.
Yes, those two concrete trucks that snuck down Jack's Corner Road Tuesday morning without notice were mine.
Sorry if they caused you any greif.
But we managed to lay the slab around the pool deck this morning.
So, who is due.
The roofers say they are coming back.
The carpenters will be there for the entire week.
And I think that is about all.
So along Jacks' Corner Road you can expect.
Various utes and trucks and maybe a delivery truck with some roofing material.
Hope this helps
Regards
Chris

Thursday, October 15, 2009

Friday 16th October

Another quiet day on site.

The carpenters will be back.

The electrician has taken a few days off as he just gets in the carpenters way.

The plumber has about two hours work to do and then he can take a week off.

Oh, And the guy is coming to do the flashing above the sill brick.

So it will be quiet along Jacks Corner Road, but you can expect.

The usual tradesman's utes and trucks

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Wednesday, October 14, 2009

Thursday 15th October



I am going to have to do some landscaping around the pool, unless I go for that Nevada Look


Another day with not too many people on site.


At this stage I think it is just the plumbers and the carpenters.


I am told we are not expecting any deliveries.
So Jack's Corner Road should be fairly quiet, you can expect:
A collection of tradesman's utes and trucks
Hope this helps
Regards
Chris

Tuesday, October 13, 2009

Wednesday 13th October

Something about outriggers. Well that what the carpenters keep saying.

I think it is going to be quiet on Wednesday.

The plumbers say they are ahead of schedule and want to go somewhere else.

The electrician says he is waiting for the carpenters to finish something. I secretly think he is moonlighting on another job.

The Carpenters will be back in force and that's about it except for a delivery that I know nothing about.

So, along Jack's Corner road, you can expect :

A few mealy carpenters utes and maybe
A delivery truck.
Hope this helps
Regards
Chris
Christreuen@bigpond.com

Monday, October 12, 2009

Tuesday 13th October

Sorry, ran out of batteries in the camera.

Weather permitting, I am expecting.

The carpenters to start the cladding.

The plumbers to finish the fire system.

The electrician to return. He seems to shrink away at the first sign of rain.

The bricklayers have finished which is shame because the were great guys.

And maybe deliveries of windows and wood.

So along Jack's Corner Road, you can expect.
Assorted utes and trucks and
Maybe some deliveries.
Hope this helps
Regards
Chris
christreuen@bigpond.com

Sunday, October 11, 2009

Monday 12 October

Now, This is what I think is happening.

Bricklayers coming to finish.

Carpenters aplenty to finish the roof beams.

Electrician, there are miles of cables in this joint.

Plumbers, for the sprinkler system and maybe some deliveries.

So, along Jack's Corner Road you can expect.

Assorted utes and Trucks
Hope this helps
Regards
Chris
christreuen@bigpond.com

Thursday, October 8, 2009

Friday 9th October

Can you believe , More Scaffolding.

Weather permitting, It could be a busy day.

The bricklayers are due back.

The carpenters are due back.

The plumbers are due back.

There is site inspections all morning.


The timber to finish the roof is due

And I think there are more bricks coming.





So along Jacks' Corner road you can expect:


The above utes and trucks for the various tradespeople
and delivery trucks for both the timber and the bricks.
Hope this helps
Regards
Chris
Christreuen@bigpond.com

Tuesday, October 6, 2009

Wednesday 7th October



And then they just put the windows in.


The plumbers are due back on site.

The electrician is having the day off

The carpenters are due back on site.


And maybe the scaffolding guys will turn up.

So, along Jacks' Corners Road you can expect:

Utes and trucks again.

Hope this helps

Regards

Chris

Christreuen@bigpond.com

Monday, October 5, 2009

Tuesday 6th October



Weather permitting:

The electrician will be on site.

The plumbers will be on site

The scaffolding guys will be on site.

The bricklayers will be back

and if I keep my fingers crossed maybe the carpenters will re appear.

I don't know of any deliveries due but maybe there is more scaffolding to come.

So , along Jack's Corner Road, if the weather doesn't interfere

you can expect.

All the associated utes and trucks.

Hope this helps

Regards

Chris

Christreuen@bigpond.com

Thursday, October 1, 2009

Friday 2nd October



It is important to keep the bricklayers happy.
So, the bricklayers are back on site.
The electrician is due back.
The plumbers put in a big effort and may be taking the day off and
There is a delivery of bricks due and maybe some more cladding.

So along Jack's Corner Road you can expect:
The above utes and trucks and
The delivery truck for the bricks.
Hope this helps
Regards
Chris

Wednesday, September 30, 2009

Thursday 1st October



And after the scaffold comes the roof.


So the bricklayers will be back on site.

The plumber is due first thing in the morning.

The electrician had a great time with someone else but will be back today.

Scaffolders are due back.

Deliveries of scaffolding, bricks and maybe weatherboards.

So, along Jack's Corner Road you can expect;

Tradesman's ute and trucks

Large truck delivering scaffolding and

Maybe a large truck delivering weatherboards.

Hope this helps

Regards

Chris

christreuen@bigpond.com

Tuesday, September 29, 2009

Wednesday 30th September

Full steam ahead.

Brick layers are due back.
Plumber should be on site.
Electrician is being unfaithful and going to another job for a day.
And maybe the carpenetrs will be there.

There may be some deliveries of sand /cement/ bricks.

So, along Jack's Corner Road you can expect.

The above utes and trucks and maybe a delivery truck.

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Monday, September 28, 2009

Tuesday 29th September

Another Busy day.

The plumbers are due on site.
The carpenters should be there.
The bricklayers will be back again and
The electrician will be there again.
All depending on the weather.

So along Jack's Corner Road you can expect

All their utes and trucks.

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Friday, September 25, 2009

Saturday 26th September




Bricklayers are a messy lot.


On Saturday they will be back.
So expect to see their truck coming along Jack's Corner road
very early in the morning.
Hope this helps
Regards
Chris

Thursday, September 24, 2009

Friday 25th September

Friday Should be same ol same ol.

The bricklayers will be back again
The electrician will be on site.
The plumbers are due back again
and if the windows didn't show up Thursday
then they are still expected.

So, along Jack's Corner Road you can expect:
Bricklayer's Truck
Electrician's van
Plumber's truck and ute and
maybe the delivery trucks.

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Wednesday, September 23, 2009

Thursday 24th September



Sorry, It has been so busy.


On Thursday we are expecting the bricklayers to return.

The carpenters are due back.

The electrician will be back

And the plumbers are due on site.
So, along Jack's Corner Road you can expect.
The bricklayer's truck.
The carpenter's truck and ute
The electricians Van
and maybe the plumbers Truck
and possibly the truck delivering the rest of the windows.
Hope this helps
Regards
Chris
Christreuen@bigpond.com

Thursday, September 17, 2009

Friday 18th September





You put them together bit by bit.


I don't think Friday will be that busy.


As far as I know it will only be a small crew of carpenters putting the windows in.


I am still expecting deliveries of bricks and sand.


So along Jacks Corner Road you can expect.


The carpenters trucks and ute

and Maybe some delivery trucks.


Hope this helps

Regards

Chris

Christreuen@bigpond.com

Wednesday, September 16, 2009

Thursday 17th September

Thursday should be big.


The carpenters are due back.


The bricklayers are starting.


The electrician is due on site.


and the plumber may be back.

There are also a number of deliveries due.

So, you can expect along Jack's Corner Road.

The carpenters truck and ute.

The bricklayers trucks.

A truck delivering bricks.

A truck delivering tiles.

The electrician's van

and maybe the plumbers truck.

Hope this helps

Regards

Chris

Christreuen@bigpond.com.

Monday, September 14, 2009

Tuesday 15th September

Tuesday, Weather permitting, will be a busy day.

The crane is due back to place more of the roof trusses.

The carpenters are due back.

The plumber is supposed to be on site with his crew

The electrician is back on site

The site manager is organising some steel work on site.

and the bobcat is due back to fill in some more trenches.


So, along Jack's Corner road you can expect.

The crane
The carpenter's truck and utes
The plumber's truck and ute
The electrician's Van
and the truck with the bobcat on the back.

Sorry for the inconvienence but
hope this helps
Regards
Chris
Christreuen@bigpond.com

Thursday, September 10, 2009

Friday 11th September

Back Now, Lovely holiday, thanks for asking

Busy time while I was away and the house is looking great.

The pool is in and it is full steam ahead.

On Friday they will be placing the roof trusses and this will take a few days.

So , you can expect along Jack's Corner Road.

The carpenter's trucks and utes

an a crane to lift the trusses into place.

Hope this Helps
Regards
Chris
christreuen@bigpond.com

Wednesday, August 26, 2009

Thursday 27th August

Sorry, I forgot to mention that I have to go away for the next few days.

As far as I know the carpenters will be working at the site for the next week.

The pool is due to be delivered on Tuesday and we need another load of sand as the first one blew away.

So, over the next week you can expect along Jack's Corner Road

The carpenter's truck and ute every work day.

Small deliveries of wood.

Another truck and dog with sand.

and if all goes well the pool arriving on Tuesday.
Hope this helps
regards
Chris
Christreuen@bigpond.com

Tuesday, August 25, 2009

Wednesday 26th August

Too windy to do anything.

The pool has been postponed till next week and not much else happened at Noggarah.

Wednesday we are expecting the carpenters back on site and possibly more deliveries of wood.

So, along Jack's Corner Road you can expect:

The carpenter's Truck and utes

And possibly a truck delivering wood.

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Monday, August 24, 2009

Tuesday 25th August

You put them together Bit by Bit.

The carpenters had a great day today and nearly got the frame up.

Tuesday should be fairly quiet.

The carpenters are having the day at another job.

The pool is due to be delivered around 9-9.30 in the morning.

The truck with bobcat will be coming in earlier and so will the pool installation guy.

So along Jack's Corner Road you can expect;

The truck with bobcat on board

The pool guy's ute

and the truck delivering the pool.

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Sunday, August 23, 2009

Monday 24th August

Well, The pool delivery was postponed but they did get the garage frames up.

I think it is going to look like a fire station.

A fairly quiet day is expected for Monday.

The Carpenters are due and so is another delivery of windows.

The electrician is coming down to check that all is going OK

And the site manager will be there to set everything straight.

And the load of sand may also be delivered.


So along Jack's Corner Road you can expect:

Tradesman's utes and truck.

Large truck delivering windows and

Maybe a truck and dog delivering sand.
Hope this helps
Regards
Chris
Christreuen@bigpond.com

Thursday, August 20, 2009

Friday 21 August

Let's Hope they deliver the pool today as we are all ready for it.

The carpenters started on the frames and will continue with that on Friday.

The excavator has finished for the while
and some of the windows were delivered.


So along Jack's Corner Road you can expect:
The truck with the excavator leaving in the morning.
The carpenters truck and ute
The pool being delivered
A truck and dog delivering sand
The plumber's truck in the afternoon
and other tradesman's utes.
Hope this helps
Regards
Chris
Christreuen@ bigpond.com

Wednesday, August 19, 2009

Thursday 19th August

Well, not everything goes to plan.

The carpenters are starting on Thursday.

The pool digging will continue and there is still a possibility
that the windows will be delivered Thursday or Friday.

So, along Jack's Corner Road you can expect:
Peter the site manager in his ute
Two carpenter's utes and a small truck.
The boys utes coming to do more pool digging and
Maybe the window truck.

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Tuesday, August 18, 2009

Wednesday 19th August

it's pool time.

Wednesday we start the digging the pool.

And the carpenters are turning up to start erecting the frame.

I am not expecting the delivery of the pool till Friday but that has not been confirmed as yet.

There may also be a delivery of sand for under the pool.

So along Jack's Corner Road you can expect:

The truck with the small excavator on it.

The carpenters in their utes.

Possibly the truck and dog with the sand.

And Dave Selby to oversee everything.

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Monday, August 17, 2009

Tuesday 18th August


So, the last of the frames have arrived. And I ain't got a one yet.

The carpenters are either starting Tuesday or Wednesday and the plumber may be on site Tuesday to continue the drainage work.

I am not expecting any big deliveries on Tuesday but the windows and pool are due later in the week.

So, along Jack's Corner road we may have:

The carpenter's Ute and
The plumber's Truck.

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Sunday, August 16, 2009

Monday 17th August

Late News
Sorry, I have just found out that we are having a delivery tomorrow.

And I thought Monday was going to be a day of rest.

Monday , the remainder of the frames are going to be delivered.

So, along Jack's Corner Road you can expect:

One huge 40" semi trailor fully laden with the frames for the shed.

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Thursday, August 13, 2009

Friday 14th August


Thank you so much for your patience yesterday. It was a tough day with a lot of concrete trucks.

The concretors did an amazing job and managed to finish the entire main slab in one day. Mind you it was after 5pm when they signed off.

Friday is supposed to be an easy day.

The electrician will be back connecting the power to the main house site and
There is a possibility that the frames for the garage may be delivered today.

So along Jack's Corner Road you can expect;

The electrician's ute and
Maybe a 40" semi-trailer with frames on it.

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Wednesday, August 12, 2009

Thursday 13th August

After a few adjustments the engineer has signed off on the preparation of the main slab.

So, weather permitting, Thursday we pour the slab.

It could be a very busy day as this slab is about twice the size of any other pour we have done.
The good news is that this will be the end of the concrete trucks for a while.

So along Jack's Corner road On Thursday you can expect:

The concrete crews arriving early in the morning and

a huge number of concrete trucks from about 7.30am till around 2 0r 3pm

I hope this helps
Regards
Chris
christreuen@bigpond.com

Tuesday, August 11, 2009

Wednesday 12th August


Tuesday was a frantic day but we got a whole lot done.
Wednesday, weather permitting, the concretors will be doing the final preparation of the main slab.
There may be another delivery of frames for the shed and
The electrician will be there moving the power over to the main house site.
If it is fine, then you can expect along Jack's Corner Road:
The tradesman's utes and trucks
and possibly a large truck delivering house frames.
Hope this helps
Regards
Chris

Monday, August 10, 2009

Tuesday 11th August


Hi Tom,

These guys are doing a great job but believe it or not we still need another delivery of pods and steel Tuesday.

The concretors will continue to prepare the main slab.

The electrician will be getting the power across to the main house.

The plumber will be doing storm water and sewerage to both sites

And the excavator will be doing a lot of trenching.


So along Jack's Corner Road you can expect;

Tradesman's utes and trucks

The truck with the excavator on the back.

The delivery truck with the pods and steel and

The council inspector to make sure we are doing everything correctly.

Hope this helps,
Tom, lovely to have you on board
Regards
Chris
Christreuen@bigpond.com

Sunday, August 9, 2009

Monday 10th August

Well, they got the wings of the house poured on Friday.

Monday should be a fairly easy day.

The concrete crew are back and

there should be another shipments of Pods arriving.

So along Jack's Corner Road you can expect:

Tradesman's utes and Trucks and

A large truck and trailor delivering the pods

Hope this helps
regards
Chris
Christreuen@bigpond.com

Thursday, August 6, 2009

Friday 7th August

So, This is what a waffle pod looks like.

Friday will be busy.

We are pouring the two wings of the house and this pour is bigger than last wednesday.

The concrete crew will be there first thing in the morning and then the trucks should start arriving.

So, Please take care along Jack's Corner Road as there will be:

Tradesmans Utes

And concrete trucks aplenty.

Again, some of these trucks will be impassable as oncoming traffic on some sections of the road.

So, I thank you for your consideration and patience in advance.

Hope this all helps
Regards
Chris
Christreuen@bigpond.com

Wednesday, August 5, 2009

Thursday 6th August

A big day on Wednesday but the pouring of the slab went well.

At this stage Thursday should be a fairly quiet day and then another pour on Friday.

So on Thursday there will be the concreting crew preparing part of the house slab and

The electrician will be there in the afternoon.

I also expect the pest treatment guy will be there in the afternoon and

The council inspector will also be on site in the afternoon.

I am not expecting any major deliveries today.

I hope Wednesday was not too difficult for you all. But I must say I found the truck drivers really courteous on the roads.

So along Jack's Corner Road you can expect:

Mainly tradesman's utes

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Tuesday, August 4, 2009

Wednesday 5th August


Wednesday Should be a big day.
The formwork crew will be back on site.
The concretors will be there pouring the slab.
There will be another delivery of waffle pods and steel.
And the plumber was to fix something yesterday but I think it might happen today.
So, take care along Jack's Corner Road as there will be:
Concrete trucks
Formwork crew in their truck.
Large delivery truck with Pods and Steel
And maybe the plumbers truck.
Please be aware that there are places along the road where you can not pass these oncoming trucks and it may require you to reverse to the nearest driveway.
I appreciate your patience.
Hope this all helps
Regards
Chris

Monday, August 3, 2009

Tuesday 4th August

Well, they have finished preparing the Garage slab ready for it to be poured and now they start on the house slab.

The plan is for the first pour to happen on wednesday if there are no hiccups.

So along Jacks Corner Road you can expect:

The concrete crew in their truck.

The plumber in his truck.

The electrician in his ute

And maybe another delivery of Waffle Pods and steel.

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Sunday, August 2, 2009

Monday 3rd August

Monday should be a busy day.

The rest of the steel should arrive.

The waffle pods are due to arrive.

The crew to prepare the slab is supposed to be here first thing in the morning.

The small excavator is going to be deepening some trenches.

The plumbers is doing some more drainage.

And the electrician will be on site.

So along Jack's Corner Road you can expect.

Tradesman's utes

and large trucks a plenty.

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Friday, July 31, 2009

Saturday 1st August

The plumber will be working today.

The rain water tank guys are coming to pick up their formwork.

And only half of the steel was delivered so they may be delivering the rest either today or monday.

So along Jack's Corner Road you can expect:

Tradesman's utes

Truck to collect the formwork
and maybe a truck delivering steel.

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Thursday, July 30, 2009

Friday 31st July

Well, the first shipment of frames has arrived.

If all goes well the 2nd shipment will come in on Friday and possibly another shipment on Friday afternoon or Saturday Morning.

The concretors will be in and there will also be large delivery trucks for the waffle pods and the steel for the slab.

The plumbers are due back to finish some drainage and the electrician will be doing some finishing touches.

So please take care on Jacks Corner Road tomorrow as there will be:

Tradesman's utes a plenty.

Large semi trailers

Delivery trucks.

Some of these trucks may be impassable on sections of the road so could you please either pull into a driveway or reverse back to a passable location.

If you see trucks waiting at the entrance to Griffins Fire trail this may mean that they are waiting for a truck to come up the hill. Please feel free to ask the driver if it is safe to proceed.

Hope this helps and
sorry for the inconvienence.
Chris
Christreuen@bigpond.com

Wednesday, July 29, 2009

Thursday 30th July

ah, so this is how you check to see if a 4 metre high truck will fit down your driveway.

Another fairly quiet day at Noggarah on Thursday.

The electrician will be there and maybe a gravel delivery.

And there is a possibility that the first of the frames will be arriving.

So along Jack's Corner Road you can expect:

Tradesman's utes

and maybe a truck and dog

And maybe the truck with frames

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Numbered List

Tuesday, July 28, 2009

wednesday 29th July


I am not expecting any deliveries to Noggarah on Wednesday.
In fact it should be a fairly quiet day.
The electrician will be there working again.
The bobcat has finished for now.
The plumber can't get there till later in the week and the slab has been put back a few more days.
So along Jack's Corner road I am only expecting:
Tradesman's Utes.
Hope this helps
regards
Chris

Monday, July 27, 2009

Tuesday 28th July


Slowly moving forward.
Tuesday the plumber and electrician are back and the bobcat will be doing some more work around the place.
The slab has been put back till wednesday or thursday and as yet I don't know how big that crew will be.
There are some site inspections to happen Tuesday and another truck of gravel is still to come.
So along Jack's Corner Road you can expect:
Tradesman's utes
Gravel truck
and the bobcat on the back of a truck.
Hope this helps
regards
Chris

Sunday, July 26, 2009

Monday 27th July

And this is just the airconditioning ducts.

The slab is going to look like a porcupine when it is finally laid.

Monday, weather permitting could be a busy day.

The electrian wants to check all the ducting before the concretors get to it.

The plumber still needs to finish some minor stuff before the steel goes in.

The bobcat has some more filling in to do.

And the concretors are arriving to lay the steel.

So if it is a fine day, along Jack's Corner road you can expect

Tradesman's utes a plenty.

Truck carrying the re enforcing steel.

A truck and dog with gravel.

I hope this helps
Regards
Chris
Christreuen@bigpond.com

Friday, July 24, 2009

Saturday 24th July

We will be doing some finishing off to the airconditioning system today.

That will be the only thing.

No deliveries expected.

So along Jack's Corner Road you can expect.

Tradesman's utes and me in a panic.

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Thursday, July 23, 2009

Friday 24th July

Friday once again shouldn't be too hectic.

Weather permitting both the plumber and the electrician will be working.

There will be some plumbing delivery in the morning and around midday
the bobcat will be coming back on site to do a clean up.

Also there will be two deliveries of gravel by truck and dog.

So along Jack's Corner Road you can expect
Tradesman's utes
Small deliver trucks
The truck and dog with the gravel
and the truck carrying the bobcat.

Hope this helps

Regards
Chris
Christreuen@bigpond.com

Wednesday, July 22, 2009

Thursday 23rd July

Thursday shouldn't be too hectic a day.

The plumbers have finished the internal drainage.

The septic tanks have arrived.

The tennis court is nearly finished.

But we continue on with the airconditioning.


So along Jack's Corner Road you can expect:

Tradesman's utes

and some small deliveries.

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Tuesday, July 21, 2009

Wednesday 22nd July

Tuesday went well
and Wednesday we should be doing:
More Plumbing work
More work on the electricals and
I am told the septic system is turning up

So along Jack's Corner road You can expect:
Tradesman's utes
and the truck delivering the septic System.
There may also be some minor deliveries.

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Monday, July 20, 2009

Tuesday 20th July

Monday went really well.

And Tuesday shouldn't be too bad either.

The plumber will be working at noggarah,

The electrician will be working there

The bobcat will be doing a bit of work around the place.

And the tennis court fencers will be there to finish off.

They may be moving the small excavator off site.

So along Jacks Corner Road you can expect;

Tradesman's utes
Maybe plumbers deliveries
Truck moving the excavator out
And maybe the truck with the septic tanks

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Sunday, July 19, 2009

Monday 20th July

It should not be too busy today.

The plumbers will be on site
and
the electrician will be working on site today.

If the tennis court guys have finished their job at Goulbourn then I am expecting them
to start on the fencing today.

I expect there will be a delivery of gravel in a truck and dog.
And a slight possibility that that the remaining septic tanks will be delivered.

So along Jack's corner road you can expect:
Tradesman's utes with trailors
A truck and dog
and maybe the septic tanks.
Hope this helps
Regards
Chris
Christreuen@bigpond.com

Friday, July 17, 2009

Friday 17th July

With the overnight rain I am not sure what will be happening at Noggarah today.

I was expecting:

The tennis court guys to do the fencing.

The delivery of the septic tanks

The plumber and electrician to continue works under the slab.

The large excavator to be moved out today

And there is a site meeting with the concretors

So Along Jack's Corner Road we can expect :

Tradesman's Utes

Delevery truck for the septic system

and a large truck moving the excavator

Hope this helps

Regards
Chris
Christreuen@bigpond.com

Wednesday, July 15, 2009

Thursday 16th July


Wednesday went quite well

And Thursday should not be too heavy a day.


If the weather holds we are expecting.


The airconditioning people to lay the ducting.


The trenchers to do some more work. They will be moving a large excavator onto the site.


The delivery of the remaining septic tanks

and possibly another delivery of sand and gravell.


So along Jack's Corner Road you can expect:


Truck with excavator

Truck with septic tanks

Possibly a gravell truck and

Tradesman's utes.

Hope this helps


Regards

Chris



Tuesday, July 14, 2009

Wednesday 15th July

I think it might be busy on Wednesday.

Weather Permiting;
The tennis court guys are coming to lay the grass and there will be a large sand delivery for them around 11am.

The plumber and his team will be there for the day and I expect that there will be a delivery for them.

The electricain and his off sider will be there for the day.

And the trenching team will be working all day on the site.

So definately tradesmans truck and some deliveries on Jack's Corner Road tomorrow.

Hope this helps
Regards
Chris
Christreuen@bigpond.com

Monday, July 13, 2009

Tuesday 14th July

Tuesday shouldn't be too busy a day.
There may be some sand and gravel deliveries.
And some deliveries for the plumber.
More trenching and pipe work to be done.

So, On Jack's Corner Road you can expect:

Tradesman's trucks

And some delivery trucks.

Hope this helps
Regards
Chris
Chris.treuen@bigpond.com

Sunday, July 12, 2009

Monday 13th July


It should be a fairly quite day today.


There is a meeting with the surveyor, the plumber and the electrician on site.
There may be some deliveries but they should be only small items.
Rubbish.
Some one very kindly collected some builder's rubbish from Jack's Corner Road and wedged it under the gate that leads to Noggarah. Thanks for doing this but I must say that this builders rubbish was not from my site. It contained Plaster's Lime which we are not using at Noggarah at this stage. So someone elae must be doing some building or renovation work out along Our road.
I have spoken to my builders about rubbish and have asked them to be very mindful of this problem.
So, Monday along Jack's corner Road should be fairly quiet.
I'll let you know when we are expecting more traffic.
Regards
Chris